Skip to content
13 HOMES
Knockdown Rebuild

Stay in your suburb. Build the home you actually want.

Love your street, your school zone, your neighbours — but not your house? A knockdown rebuild gets you a brand-new 13 Homes residence on the land you already own. No house hunting, no stamp duty on land, no goodbyes.

$0 Land stamp duty
5 KDR-specific stages
8 Council areas covered
100% Turnkey delivery

It usually makes more sense than renovating.

Renovations look cheaper on paper. Then the asbestos, the rotted joists, the dated electricals and the kitchen-on-the-other-side-of-the-house all show up. A KDR gives you exactly what you want, certified to current standards, on a fixed-price contract.

Keep your address

Same street, same neighbours, same school zone, same commute. The only thing that changes is the house. Most of our KDR clients say this is the #1 reason they chose to rebuild.

Save the stamp duty

You already own the land — there's no stamp duty on it. In Western Sydney that's typically $30k–$80k that stays in your pocket compared to buying new.

Brand-new, certified

BASIX-compliant insulation, current electrical standards, modern plumbing, smoke detectors, structural certifications. Every element built to today's code — not 1985's.

Five stages — before we even start the build.

A knockdown rebuild adds a few extra steps to the front of our standard seven-stage build process. Here's exactly what happens.

KDR Stage 01

Site assessment & feasibility

We come to your block. Our team measures the lot, photographs the existing dwelling, checks easements/setbacks, sewer/stormwater locations and tree protection zones. You'll get a feasibility report with achievable house footprints for your land.

  • On-site visit & full site survey
  • Existing dwelling condition assessment
  • Easement & setback review
  • Achievable footprint study
Typical: 1–2 weeks
01
Site assessment
KDR Stage 02

Design & selections

Choose a 13 Homes design (Modern Essential, Elite or Master Craftsmen) that suits your block, or commission a custom design. Lock in your facade, floorplan modifications, and inclusions. Get the fixed-price quote.

  • Design consultation with our drafting team
  • Facade & floorplan customisation
  • Inclusion selections & upgrades
  • Fixed-price contract
Typical: 3–5 weeks
02
Design selection
KDR Stage 03

Approvals & service disconnection

We lodge with your council (or CDC certifier). Concurrently we coordinate the disconnection of power, gas, water and NBN from the existing dwelling — you don't deal with utility providers, we do.

  • DA / CDC lodgement & council fees paid
  • BASIX + NATHERS energy assessment
  • Utilities disconnection (we coordinate)
  • Asbestos & hazardous materials report
Typical: 6–10 weeks
03
Approvals and demolition prep
KDR Stage 04

Demolition & site prep

Licensed demolition contractor removes the existing house, including any asbestos containment, foundation slab and concrete driveway. Bulk earthworks and sediment control follow. Site is ready for our slab.

  • Licensed demolition & rubbish removal
  • Asbestos handling per NSW regulations
  • Foundation & driveway removal
  • Bulk earthworks & sediment control
Typical: 2–3 weeks
04
Demolition and earthworks
KDR Stage 05

Build & handover

From here, we follow the standard 13 Homes seven-stage build: slab → frame → lockup → fitout → handover. Engineer-led, fixed-price, weekly progress reports.

  • M-Class slab & structural framing
  • Lockup, fitout & finishes
  • Pre-handover walk-through
  • Keys + 90-day maintenance + 6-yr structural
Typical: 8–14 months
05
Build and handover

Eight council areas. Specialists in Western Sydney.

We don't pretend to be everywhere. We know the soil types, council quirks, and approval timelines in these eight LGAs better than any builder.

Blacktown
The Hills Shire
Penrith
Cumberland
Parramatta
Camden
Liverpool
Hornsby

Knockdown rebuild, answered.

Often, yes — particularly for major renovations. Renovating a 1970s home to current insulation, electrical and plumbing standards while reshaping the floor plan typically costs 65–85% of a brand-new build, with significantly less certainty on final price (you can't predict what's behind the plasterboard). A KDR gives you 100% new, fixed-price, with a 6-year structural guarantee.
Most clients rent in the same suburb for 8–12 months. Some stay with family, some travel. We can recommend rental agents we've worked with in your council area. The build timeline gets locked into the contract so you can plan your lease end-date confidently.
Trees with tree-protection orders — we work around them and pay for arborist reports as needed. Pools — usually retained (we design the new home with the pool in place). Sheds — depends on condition and council compliance. We assess all of this during the Stage 01 site visit.
Any home built before ~1990 in Western Sydney almost certainly has some asbestos (eaves, fibro sheeting, electrical lining boards). We engage NSW-licensed asbestos removal contractors — never anyone unlicensed. The cost is included in the KDR quote, no surprises.
For council DA lodgements, yes — neighbour notification is part of the application. We prepare the documentation and submit it; you don't door-knock yourself. For CDC pathways the requirements are different (less neighbour input). We'll tell you which pathway suits your build at Stage 02.
Construction loans work the same way as a new build — bank releases funds at each stage (deposit, slab, frame, lockup, fitout, handover). If your existing home has equity in it, your lender will assess against that. We work alongside several mortgage brokers who specialise in KDR finance — we can introduce you.

Ready to rebuild on the land you love?

Book a free on-site assessment. We'll visit your block, measure up, photograph the existing dwelling, and give you a written feasibility within 7 days — at no cost or obligation.